Export Plastic Reflector Led Supplier – LED Reflector COB Reflector Optical Reflector – Shinland

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our business sticks for the basic principle of "Quality could be the life with the firm, and track record will be the soul of it" for Index Of Refraction Of Cr 39 , Led Light Reflector Manufacturer , Reflector Led Rgb , Should you be interested in almost any goods, remember to truly feel totally free to get in touch with us for further facts or be sure to deliver us email right, we will reply you in just 24 hrs as well as the finest quotation are going to be provided.
Export Plastic Reflector Led Supplier – LED Reflector COB Reflector Optical Reflector – Shinland Detail:

Product Specification

1) Type: Optical grade PC reflector for led light
2) Model Number: SL-03520B, SL-03540B, SL-03560B
3) Material: PC
4) View Angle(Fwhm): 20°, 40°, 60°
5)  Reflective Efficiency: 91%
6)  Dimension: Φ:35.0mm H:17.6mm Φ:11.4mm (Diameter*Height*Buttom diameter)
7) Use Temperature: .-35℃ +135℃
8) Logo: Customized Available
9) Certification: UL, RoHS
10) Packing Tray packing
11) Payment Terms T/T
12) Port Shenzhen, DongGuang
13) Lead Time 3-7 days for sample order,7-15 days for mass product
14) Application Spotlight, down light, track light ..ect

COB Light Source

COB Light Source              
CREE CITIZEN BRIDGELUX SAMSUNG NICHIA LUMILEDS TRIDONIC SAMSUNG LUMENS NICHIA
CXA15 CLU028 V10 Gen6 LC010C NJCxS024Z 105 G4-10 LC020C EDC-38C NFCxL036B
    V10 Gen7   NTCxS024B 1202/1203   LC006B    
    blx C8              
    blx C8              
    E8              
    VestaTW6              
COB Holder                  

FAQ

Q1: Why choose Shinland?
A1: Good quality, Competitive price, Fast delivery, Good customer service.

Q2: Can we get free samples?
A2: Yes. We usually provide existing samples for free.

Q3: How long is the sample lead time?
A3: It’s will takes 3-4 days for existing products.

Q4: What’s your MOQ?
A4: No MOQ issues for existing products.

Q5: How long is the mass production lead time?
A5: It’s will take 10~18 days after received payment.

Q6: Can you handle OEM/ODM project?
A6: Yes, We have 24 years experience. Different from other factory which only have simple process, all aspects included R&D, making mold, injection molding, vacuum coating and market support are our company own vertically integrated production.

Q7. If you are a manufacturer or trading company?
We are professional optical manufacturer, Different from other factory which only have simple process, all aspects included R&D, making mold, injection molding, vacuum coating and market support are our company own vertically integrated production.

OUR CERTIFICATE

certificate

OUR WORKSHOP

factory

OUR EXHIBITION

exhibition

OUR TEAM

team

Packaging

packaging11
packaging12
packaging 9


Product detail pictures:

Export Plastic Reflector Led Supplier –  LED Reflector COB Reflector Optical Reflector  – Shinland detail pictures

Export Plastic Reflector Led Supplier –  LED Reflector COB Reflector Optical Reflector  – Shinland detail pictures

Export Plastic Reflector Led Supplier –  LED Reflector COB Reflector Optical Reflector  – Shinland detail pictures

Export Plastic Reflector Led Supplier –  LED Reflector COB Reflector Optical Reflector  – Shinland detail pictures


Related Product Guide:

Our company puts emphasis on the management, the introduction of talented personnel, and the construction of staff building, trying hard to improve the quality and liability consciousness of staff members. Our company successfully attained IS9001 Certification and European CE Certification of Export Plastic Reflector Led Supplier – LED Reflector COB Reflector Optical Reflector – Shinland , The product will supply to all over the world, such as: Romania, Thailand, Tunisia, We are trying our best to make more customers happy and satisfied. we sincerely hope to establish a good long-term business relationship with your esteemed company thought this opportunity,based on equal, mutual beneficial and win win business from now till the future.
  • The supplier abide the theory of "quality the basic, trust the first and management the advanced" so that they can ensure a reliable product quality and stable customers.
    5 Stars By mary rash from Bangladesh - 2017.02.28 14:19
    Staff is skilled, well-equipped, process is specification, products meet the requirements and delivery is guaranteed, a best partner!
    5 Stars By Elaine from Australia - 2018.11.28 16:25
    Write your message here and send it to us