Cheapest Reflector For Street Lights Suppliers – LED Reflector COB Reflector Optical Reflector – Shinland

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

As for aggressive price ranges, we believe that you will be searching far and wide for anything that can beat us. We can easily state with absolute certainty that for such high-quality at such price ranges we're the lowest around for Reflector Led 200 Watts , Dark Light Reflector , Led Lens , Customer pleasure is our main purpose. We welcome you to definitely build business relation with us. For further more information, you should never wait to contact with us.
Cheapest Reflector For Street Lights Suppliers – LED Reflector COB Reflector Optical Reflector – Shinland Detail:

Product Specification

1) Type: Optical grade PC reflector for led light
2) Model Number: SL-03520B, SL-03540B, SL-03560B
3) Material: PC
4) View Angle(Fwhm): 20°, 40°, 60°
5)  Reflective Efficiency: 91%
6)  Dimension: Φ:35.0mm H:17.6mm Φ:11.4mm (Diameter*Height*Buttom diameter)
7) Use Temperature: .-35℃ +135℃
8) Logo: Customized Available
9) Certification: UL, RoHS
10) Packing Tray packing
11) Payment Terms T/T
12) Port Shenzhen, DongGuang
13) Lead Time 3-7 days for sample order,7-15 days for mass product
14) Application Spotlight, down light, track light ..ect

COB Light Source

COB Light Source              
CREE CITIZEN BRIDGELUX SAMSUNG NICHIA LUMILEDS TRIDONIC SAMSUNG LUMENS NICHIA
CXA15 CLU028 V10 Gen6 LC010C NJCxS024Z 105 G4-10 LC020C EDC-38C NFCxL036B
    V10 Gen7   NTCxS024B 1202/1203   LC006B    
    blx C8              
    blx C8              
    E8              
    VestaTW6              
COB Holder                  

FAQ

Q1: Why choose Shinland?
A1: Good quality, Competitive price, Fast delivery, Good customer service.

Q2: Can we get free samples?
A2: Yes. We usually provide existing samples for free.

Q3: How long is the sample lead time?
A3: It’s will takes 3-4 days for existing products.

Q4: What’s your MOQ?
A4: No MOQ issues for existing products.

Q5: How long is the mass production lead time?
A5: It’s will take 10~18 days after received payment.

Q6: Can you handle OEM/ODM project?
A6: Yes, We have 24 years experience. Different from other factory which only have simple process, all aspects included R&D, making mold, injection molding, vacuum coating and market support are our company own vertically integrated production.

Q7. If you are a manufacturer or trading company?
We are professional optical manufacturer, Different from other factory which only have simple process, all aspects included R&D, making mold, injection molding, vacuum coating and market support are our company own vertically integrated production.

OUR CERTIFICATE

certificate

OUR WORKSHOP

factory

OUR EXHIBITION

exhibition

OUR TEAM

team

Packaging

packaging11
packaging12
packaging 9


Product detail pictures:

Cheapest Reflector For Street Lights Suppliers –  LED Reflector COB Reflector Optical Reflector  – Shinland detail pictures

Cheapest Reflector For Street Lights Suppliers –  LED Reflector COB Reflector Optical Reflector  – Shinland detail pictures

Cheapest Reflector For Street Lights Suppliers –  LED Reflector COB Reflector Optical Reflector  – Shinland detail pictures

Cheapest Reflector For Street Lights Suppliers –  LED Reflector COB Reflector Optical Reflector  – Shinland detail pictures


Related Product Guide:

Dependable high-quality and fantastic credit standing are our principles, which will help us at a top-ranking position. Adhering to your tenet of "quality very first, client supreme" for Cheapest Reflector For Street Lights Suppliers – LED Reflector COB Reflector Optical Reflector – Shinland , The product will supply to all over the world, such as: Tanzania, United Arab Emirates, Jordan, We've got a dedicated and aggressive sales team, and many branches, catering to our customers. We are looking for long-term business partnerships, and ensure our suppliers that they will absolutely benefit in both short and long run.
  • This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
    5 Stars By Daniel Coppin from Malta - 2017.09.30 16:36
    Product quality is good, quality assurance system is complete, every link can inquire and solve the problem timely!
    5 Stars By Eunice from Las Vegas - 2018.08.12 12:27
    Write your message here and send it to us